JD

Projects

Manage your carbon credit projects and track their environmental impact

Filter Projects

Total Projects

12

2 from last month

Active Projects

8

1 from last month

Total Credits

42.5

5.3 from last month

CO₂ Reduction

12,480

kg CO₂e saved

Riverside Development

ID: PRJ-2025-001

Active

Low-carbon concrete implementation for residential development with 30% recycled materials.

Credits Generated 4.3 / 6.0
Verification Status 80%

CO₂ Reduction

4,358 kg

Material Savings

215 tons

JD
Updated Apr 20, 2025

Oakwood Residences

ID: PRJ-2025-002

Active

Eco timber frame construction with sustainable sourcing and minimal waste production.

Credits Generated 2.5 / 4.0
Verification Status 95%

CO₂ Reduction

2,845 kg

Material Savings

128 tons

JD
Updated Apr 18, 2025

Metro Office Tower

ID: PRJ-2025-003

Pending

Recycled steel structure with optimized design to reduce material usage by 40%.

Credits Generated 0.0 / 8.0
Verification Status 30%

CO₂ Reduction

Pending

Material Savings

Est. 380 tons

JD
Updated Apr 15, 2025

Sunlight Plaza

ID: PRJ-2025-004

Active

Solar glass facade with integrated photovoltaic cells and high thermal performance.

Credits Generated 5.0 / 7.0
Verification Status 85%

CO₂ Reduction

5,120 kg

Material Savings

156 tons

JD
Updated Apr 22, 2025

Waterfront Apartments

ID: PRJ-2025-005

Completed

Green roof system with rainwater harvesting and low-carbon concrete structure.

Credits Generated 6.2 / 6.2
Verification Status 100%

CO₂ Reduction

6,780 kg

Material Savings

290 tons

JD
Updated Apr 10, 2025

Central Business Hub

ID: PRJ-2025-006

Active

Mixed-use development with geothermal heating and recycled steel structure.

Credits Generated 3.8 / 9.0
Verification Status 65%

CO₂ Reduction

4,250 kg

Material Savings

320 tons

JD
Updated Apr 19, 2025

Project Performance Overview

Environmental Impact

Tree Equivalent

1,248

Mature trees worth of annual carbon absorption

Overall progress 68%
Showing 6 of 12 projects